Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall. Our team removed plant growth along wall. and sealed damaged area with a new cement fillet.
RECENT JOBS
Health and safety hazard repair
Our team attended an industrial park where some steps had become a Health and Safety hazard. Lifted , cleaned and relaid the slabs on a new bed of mortar and painted step nosings.
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing