Out of hours planned maintenance of stud wall construction and paining to improve the layout of office in a commercial building.
RECENT JOBS
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter
Refurbishment / decoration of waste bin area
Our team attended a commercial office building for refurb and decorating
Electrical works
Our electricians attended a commercial office building due to a flatly floor socket. Tested socket - made safe. Returned to site and replaced damaged socket
Line Marking
Additional numbered parking was required at a retail site.
Repair of Totem sign at retail park
Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.