Our carpentry team responded to a reactive maintenance request to repair the door frame of the ladies toilets in an office building.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-09-01T15:42:01+02:00
Go to Top