Reactive maintenance to ensure that security isn’t compromised due to frame coming away from external door. The door frame headers had been loosely refitted. The side door was particularly loose – we removed each of the header plates (3 doors) and secured each of them to the framework with stainless steel screws – the doors are still able to be maintained simply by unscrewing the header plate securing screws
RECENT JOBS
Groundworks – Health & Safety
Groundworks team attended retail park. Cut out tarmac ready for new tarmac to be laid. Re-laid tarmac to fill potholes.
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.