Reactive maintenance to ensure that security isn’t compromised due to frame coming away from external door. The door frame headers had been loosely refitted. The side door was particularly loose – we removed each of the header plates (3 doors) and secured each of them to the framework with stainless steel screws – the doors are still able to be maintained simply by unscrewing the header plate securing screws
RECENT JOBS
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.