Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
The team inspected the gate motor, found piston head bearing had come apart causing all pressure from opening and closing to bend the pivot pin bracket.
Straightened bracket and resecured pivot pin. Checked operation all ok.
RECENT JOBS
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs
Decoration
Our refurbishment team attended an office building in order to refurbish a board room.
It’s getting to feel a lot like Christmas…
Our electrical team attended a retail park and installed commando sockets in the lampposts along the entry drive way in anticipation of the installation of Christmas lights
Redecoration
Our planned maintenance team attended a premier Mayfair office - repainted all walls and ceilings in common areas out of hours.
Clearing blocked gutters and downpipes
Our reactive maintenance team attended a commercial site where the bike store was suffering water ingress from a flooded roof due to the gutters and downpipes being blocked.