Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
The team inspected the gate motor, found piston head bearing had come apart causing all pressure from opening and closing to bend the pivot pin bracket.
Straightened bracket and resecured pivot pin. Checked operation all ok.
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.