Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
The team inspected the gate motor, found piston head bearing had come apart causing all pressure from opening and closing to bend the pivot pin bracket.
Straightened bracket and resecured pivot pin. Checked operation all ok.
RECENT JOBS
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor