Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting. Found 4 out of 5 lights defective on the 1st set of units and the lights on the 2nd set of units are not working due to the dusk till dawn sensor is defective. Repaired as required.
RECENT JOBS
Replacement of Drains
Our planned maintenance team attended a retail park to replace a damaged ACO channel.
Ice-cream van damage repair
Our groundworks team attended a retail park in order to repair a bollard and loose payment slabs damaged by an ice cream van.
Electrical repair
Our planned maintenance team attended a corporate gym in order to replace the gym floor.
Sticking door
Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather.
Water ingress inspection
Our roofing team attended a central London commercial building in order to investigate water ingress.
Installation of bike racks
Our planned maintenance team attended a business park in order to install bike racks to encourage cycling to the workplace.