Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting. Found 4 out of 5 lights defective on the 1st set of units and the lights on the 2nd set of units are not working due to the dusk till dawn sensor is defective. Repaired as required.
RECENT JOBS
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.