Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting. Found 4 out of 5 lights defective on the 1st set of units and the lights on the 2nd set of units are not working due to the dusk till dawn sensor is defective. Repaired as required.
RECENT JOBS
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.
Electrical Works
Our electrical installation team were asked to attend a business park to check the installation of a number of internal and external LED lights.
Roof Repairs
We attended a site at a commercial business park to carry out a brief roof inspection and then remedial works as considered necessary due to water ingress.
Office Decoration
Our planned maintenance team decorated an empty office as part of a refurbishment programme.
Graffiti Removal
Our reactive maintenance team attended an industrial site to remove graffiti.