Our electrical team attended a central London commercial building to:
- Run new power supply into the locker room
- Install plug sockets in 2 locations ready for the new lockers that SPA had previously installed.
RECENT JOBS
Filling of Pothole
Filling of pothole with cold tarmac to prevent trip hazard and standing water build up.
Installation of motion sensor and external light
Installation of external light and motion sensor for commercial building.
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.