Our reactive maintenance team attended a retail park due to lighting fault. They traced wiring back to distribution board and isolated supply, removed defective light fittings and fitted new led units altered wiring to enable switch to operate.
RECENT JOBS
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.