Reactive maintenance – to reinstall a parking bollard at an industrial site. Removed old bollard cemented in new one and left the site tidy.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-06-04T12:33:22+02:00
Go to Top