Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.