Our reactive maintenance team attended a central London office to

– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.

RECENT JOBS

CCTV

Installation of a lamp post and cctv camera at a site that was susceptible to fly tipping

2020-12-15T15:08:48+02:00
Go to Top