Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Height Restrictor
As part of a planned maintenance schedule we fabricated and fitted a height restrictor at a retail park to improve traffic management.
Gully Replacement
A planned groundworks job to replace broken and loose gully slabs.
Refurbishment of Fire Exit
A planned maintenance job in response to a fire risk assessment.
Tarmac Repair
Planned maintenance in response to a health and safety review.
Clearing of Moss and Algae
Planned maintenance in response to health and safety review.
Groundworks Retail Park
Planned maintenance including groundworks, signage and drains.