Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.
Installation of Microwave Sensors
Installation of microwave sensors on stairs.
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.