Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Traffic Control
Installation of traffic control signs at commercial site.
Stainless Steel Bollards
Fitting of bollards to protect pedestrian access to Marks and Spencer at retail center.
New Concrete Level
Repair of pavement after Health and Safety review to ensure no trip hazards.
Quarterly Refurbishment – Retail Park
Quarterly visit including electrics - signs and trip hazards.
Securing of Site with Concrete Blocks
Unwanted visitors can result in significant damage and legal fees - we are experienced at securing sites using concrete and digging trenches and building up earth mounds.