Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Repair of ‘Bollard Light’
Having bollards and lights securely fixed prevents vandalism and increased reactive costs.
Tap Replacement
Replacement of tap - we’re happy to help however small the job.
Investigation of water ingress
Often blocked gutters can cause significant problems, these can be avoided by performing regular gutter clearance.
Decoration of Stairwell
Decoration of stairwell.
Earth Works
Is your site secure from unwanted visitors? The construction of a trench to prevent unauthorised caravans/vehicles from entering.
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!