Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.