Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.Â
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.
Maintenance of Delivery Access
Servicing and maintenance of ground floor delivery doors including door adjustment , sealing strip to prevent heat loss and re positioning of gears.