Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex that was quiet during the Coronavirus period making health and safety considerations considerably easier and allowing the team to work during normal working hours. The team also removed signage for a Lidl outlet that was no longer leasing space.
RECENT JOBS
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.