Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex that was quiet during the Coronavirus period making health and safety considerations considerably easier and allowing the team to work during normal working hours. The team also removed signage for a Lidl outlet that was no longer leasing space.
RECENT JOBS
Commercial Plumbing
Reactive maintenance response to blocked sinks in ladies bathroom.
Shower Glazing
Replacement of shower glazing in commercial building as part of reactive maintenance response for the client facilities manger.
Repair of post and bar fence
Repair of post and bar fence
Surface drainage
As part of a planned preventative maintenance programme groundworks were carried out to replace broken drainage channel.
Removal of trip hazards
Laying of concrete paving to remove a trip hazard.
Emergency repair of bollard
Reactive maintenance - to reinstall a parking bollard at an industrial site. Removed old bollard cemented in new one and left the site tidy.