Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex that was quiet during the Coronavirus period making health and safety considerations considerably easier and allowing the team to work during normal working hours. The team also removed signage for a Lidl outlet that was no longer leasing space.
RECENT JOBS
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.