Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Groundworks
Attended retail car park and removed damaged bollards. Supplied and fitted new concrete bollards.
Decorating
Attended commercial office and prepared areas for decorating.
Flat Roof Works
Attended commercial building and carried out roof repairs. Added extra pipework to divert water, repaired flashing and coated entire flat roof with liquid rubber.
External Decorating
Attended office car park and repainted the middle island of the car park entrance.
Electrical
Electrician attended commercial building to find no power supply to led light fixture.