Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Groundworks bollard installation
Our groundworks team attended a retail park.
Commercial plumbing
Plumber attended a retail site in Derby
Decorating
Our decorating team attended a central London commercial office.
Installation of hand rails in dry riser
Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser.
Commercial roof repair
Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.