Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs
Decoration
Our refurbishment team attended an office building in order to refurbish a board room.
It’s getting to feel a lot like Christmas…
Our electrical team attended a retail park and installed commando sockets in the lampposts along the entry drive way in anticipation of the installation of Christmas lights