Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.
Canteen refurbishment
Our refurbishment team attended the canteen of a commercial premises.