Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Emergency lock replacement
Team attended a commercial building and identified, sourced and replaced lock.
Health and safety hazard repair
Our team attended an industrial park where some steps had become a Health and Safety hazard. Lifted , cleaned and relaid the slabs on a new bed of mortar and painted step nosings.
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.