Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Emergency Glass Replacement
Emergency glass replacement for entrance door.
High Level Gutter Clearance with Spider Boom
Clearing high level gutters of a commercial office in order to prevent water ingress problems in the future using a C230 Spider Boom.
Fitting of solar reflective film
Fitting of solar reflective solar film to external windows of commercial building in order to reduce air conditioning requirements leading to substantial costs savings and increased building energy efficiency.
External Painting and Refurbishment of Commercial Offices
Large scale refurbishment of commercial offices in Kensington including - painting, window refurbishment and pointing.
Door Frame Repair
Quality carpentry and painting can make woodwork look just like new even after a break in.
Removal of bird waste from flat roof.
Removal of bird waste from flat roof.