Our planned maintenance team attended an industrial centre and removed damaged gate and disposed of.
Dug out hinge post and disposed of.
Fabricated and installed a new swing gate with new hinge post to align with existing 2nd gate leaf.
Tested operation
RECENT JOBS
Installation of Bollards
Installation of Bollards.
Lighting Ornamental Stone
Lighting the ornamental stone bearing a shopping centre name.
External Steps
Repair of step to remove trip hazard.
Steel Edge Protection
Installation of plant, edge and isolation switch protection and gates.
Steel Gates
Fitting of steal access gates to stories to comply with regulations.