Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door. The team removed the doors. Lifted threshold and broke out broken pivot bases. Fitted new bases to floor and resecured threshold strip. Changed pivot bearings on both doors. Rehung doors and adjusted to ensure correct closing.
RECENT JOBS
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.