Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door. The team removed the doors. Lifted threshold and broke out broken pivot bases. Fitted new bases to floor and resecured threshold strip. Changed pivot bearings on both doors. Rehung doors and adjusted to ensure correct closing.
RECENT JOBS
Groundworks – Health & Safety
Groundworks team attended retail park. Cut out tarmac ready for new tarmac to be laid. Re-laid tarmac to fill potholes.
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.