Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door. The team removed the doors. Lifted threshold and broke out broken pivot bases. Fitted new bases to floor and resecured threshold strip. Changed pivot bearings on both doors. Rehung doors and adjusted to ensure correct closing.
RECENT JOBS
Emergency lock replacement
Team attended a commercial building and identified, sourced and replaced lock.
Health and safety hazard repair
Our team attended an industrial park where some steps had become a Health and Safety hazard. Lifted , cleaned and relaid the slabs on a new bed of mortar and painted step nosings.
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.