Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door. The team removed the doors. Lifted threshold and broke out broken pivot bases. Fitted new bases to floor and resecured threshold strip. Changed pivot bearings on both doors. Rehung doors and adjusted to ensure correct closing.
RECENT JOBS
Repair of Totem sign at retail park
Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.
Installation of bollards
Our groundworks team attended a prestigious residential develop and installed suitable bollards to prevent unauthorised vehicle access.
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier