Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Gate repairs
Our reactive maintenance team attended an industrial unit due to a damaged gate.
Gutter and roof clearance
Our preventative maintenance team attended an industrial site in order to clear out roof gutters and flush downpipes in order to prevent any future water ingress
Decorating
Our decorating team attended a retail outlet in order to repair an area of water ingress.
Refurbishment following water ingress
Our decorating team attended a student accommodation block following a water leak
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed