Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Installation of new roof hatches
Installation of new roof hatches
Installation of muster point post
Installation of muster point post
Replacement of leaking auto air vents
Our commercial plumbing team attended a medical centre where water leakage had been observed.
Health & Safety Repairs at Retail Park
Our reactive maintenance team visited a retail park where a number of minor Health and Safety issues had been raised.
Water Ingress
Our preventative maintenance team visited a commercial building in central London that had experienced a number of water ingress issues.
Road lining at retail park
Our planned maintenance team visited a retail park in order to repaint faded road markings.