Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.
Canteen refurbishment
Our refurbishment team attended the canteen of a commercial premises.
Damaged wall due to plant growth
Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall.
Refurbishment
Planned maintenance of stairwell of commercial building.
Clearance of fire escape
In response to a Fire Risk Assessment our reactive maintenance team attended an industrial site.
Hand sanitiser installation
Our preventative maintenance team installed hand sanitiser and signage throughout a commercial premises to ensure that health and safety guidance relating to the corona was followed and the premises were COVID-19 SECURE .