Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Relay paving stones
The groundworks team attended a retail park where damaged paving stones represented a trip hazard and relaid.
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .
Wall construction and handrail replacement
Our groundworks team visited an industrial park in order to reconstruct a damaged wall and replace and reattach a handrail.
Health and Safety Job
Following a health and safety survey our preventative maintenance team were asked to highlight potential hazards at a commercial building to reduce the risk of accidents.
Decoration
Out of hours planned maintenance of stud wall construction and paining to improve the layout of office in a commercial building.