Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Wall Construction
Reactive maintenance - our groundworks team attended a business park to reconstruct a wall that had been damaged by a vehicle, reusing existing brickworks where possible.
Repair of mag lock
Our locksmith attended commercial premises as the mag lock essential for security of the site had broken. The problem was fixed within 2 hours.
New street lights
Electrical installation team fitted 3 new 6 meter street lights in commercial office car park with LEDs. This included groundwork in order to install new electrical cabling for the lights.
Installation palisade fence
Planned maintenance team installed a fabricated palisade fence at an industrial site in order to enhance the security of the site.
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.