Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Brickworks
Repair and Replacement of Brickworks
Take up decking – repair roof – clear gutters – replace decking
Take up decking - repair roof - clear gutters - replace decking.
Installation of roof railing
Installation of roof railing following health and safety review.
Installation of stair nosing
Installation of stair nosing at retail centre to prevent health and safety hazard.
Installation of floodlights and electrical testing
Installation of floodlights and electrical testing.
Replacement of Loose Slabs
Groundwork replacement of loose slabs at commercial office to prevent health and safety risk.