Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.