Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Water Ingress
Report commissioned to investigate water Ingress at commercial office.
Electrical Earthing Point
Uplift and relay of pavement in order to upgrade earthing rod to ensure compliant with regulations.
Lead Guttering Using Harnesses
Lifting and replacement of lead guttering following resin patch repairs using harnesses.
Gutter Repair
Repair of guttering preventing water ingress at residential flat.
Cleaning External
Cleaning and refreshing external parts of commercial building prior to being relet.
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.