Fitting of solar reflective solar film to external windows of commercial building in order to reduce air conditioning requirements leading to substantial costs savings and increased building energy efficiency.
RECENT JOBS
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.
Speed Limit Sign
Installation of speed limit sign to ensure safe traffic flows at industrial site.
Concrete Trip Hazards
Concreting of trip hazards - The swift identification and rectifying of any trip hazards can prevent any injury or claims occurring
Highlighting of Steps
Highlighting of steps in order to prevent trip hazards and potential accidents.
Securing of Bike Shed
Fitting slats to open section of a bike store and new lock : Preventative measures to prevent fly tipping and secure open areas can save clearance costs.








