Our reactive maintenance team attended an industrial unit due to a damaged gate.
Cut out damaged sections of metal on the gate and grind off old weld from gate stiles.
Supply and weld in 3 new 65mmx12mm sections.
Paint with external black metal paint
RECENT JOBS
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.
Electrical Works
Our electrical installation team were asked to attend a business park to check the installation of a number of internal and external LED lights.
Roof Repairs
We attended a site at a commercial business park to carry out a brief roof inspection and then remedial works as considered necessary due to water ingress.
Office Decoration
Our planned maintenance team decorated an empty office as part of a refurbishment programme.
Graffiti Removal
Our reactive maintenance team attended an industrial site to remove graffiti.
Installation of solar bollards
Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.