Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand.
Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
RECENT JOBS
Installation of hand rails in dry riser
Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser.
Commercial roof repair
Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs