Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.