Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Gate repairs
Our reactive maintenance team attended an industrial unit due to a damaged gate.
Gutter and roof clearance
Our preventative maintenance team attended an industrial site in order to clear out roof gutters and flush downpipes in order to prevent any future water ingress
Decorating
Our decorating team attended a retail outlet in order to repair an area of water ingress.
Refurbishment following water ingress
Our decorating team attended a student accommodation block following a water leak
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed