Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Refurbishment following water ingress
Our decorating team attended a student accommodation block following a water leak
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed
Totem Refurbishment
Our maintenance team attend a retail site - removed old vinyls and replaced with new tenant vinyls on 3 totems - cleaned and removed graffiti
Security Signage
Our maintenance team attended a business park and installed security signage (CCTV in operation and private property) in order to ensure that 3rd parties were made aware upon visiting
Bollard Installation
Our groundworks team visited an industrial site in order to replace a bollard that had been damaged by an HGV.
Sign Refurbishment
Our reactive team attended an industrial site in order to refurbish a sign that had been the victim of a poor graffiti artist