Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Replacement of damaged safety barrier
Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk.
Freddy the falcon
Seagulls were creating a health and safety issue at an industrial site.
Lobby decoration
Our decorating team attended a commercial premises in order to decorate the citing and stairwells of the large lobby area.
Light repair in car park
Our electrical team attended site and isolated electrical supply to light fittings.
EICR wiring certificate
Our electrical team attended site in order to test and provide an EICR on 3 36 way 3 phase distribution boards.
Palisade fence repairs at industrial site
Our reactive maintenance team for repair works carried out to palisade gates to the front of unit of 4 adjusting gates to allow locking eyes to line up.